CASE STUDIES
How Group GTS gets its electric trucks ready to depart every morning
Group GTS is fully transitioning to electric trucks. This requires a charging infrastructure that simply works, without any hassle. The requirement was clear: ensure the trucks can charge overnight, so they are ready to drive every morning. No impact on daily operations, no added complexity.
The Challenge
Group GTS needed a reliable charging solution for their electric trucks, tailored for overnight charging. The trucks needed to charge overnight so they would be ready for use every morning, without disrupting daily operations or adding complexity to the site.

The Solution from MEGA Charge®
Reliable DC Charging Solution: MEGA Charge installed a Sungrow IDC120 fast charger on site, fully optimized for overnight charging.
Easy to Use: The solution was designed practically so that charging naturally becomes part of daily operations.
Seamless Integration: From design to delivery, a scalable solution was chosen without over-engineering, ready to grow with the fleet.


The Result
Trucks charge overnight and are ready for use every morning, without disrupting the operational flow.
The foundation was laid for further fleet electrification. This first site is the starting point for further rollout.
View other case studies
How Group GTS gets its electric trucks ready to depart every morning
Overnight charging for e-trucks without impacting daily operations.
View the case study
How Multiobus aligns charging infrastructure with passenger transport
Reliable charging for vehicles with fixed routes and schedules.
View the case study
How Distrilog uses smart night charging for lower energy costs
Smart night charging for e-trucks at the lowest possible energy cost.
View the case study