charge

Downtime, malfunctions, or charging stress at your site?

MEGA Charge delivers end-to-end charging infrastructure for electric truck operations: design, installation, monitoring, and service. Reliable today, scalable for tomorrow.

Charging infrastructure is the foundation. Reliability is the difference.

MEGA Charge is the infrastructure and operations layer within the MEGA ecosystem: your charging location, performance, and uptime  
with one party taking ownership.

The problem

Why charging e-trucks often becomes complex

Once you have scale and tight departure times, charging becomes an operational risk.

  • Trucks not ready on time due to unpredictable charging
  • Limited grid capacity blocking growth
  • Too many parties → unclear responsibility
  • Downtime and incidents that disrupt your schedule
MEGA Charge transforms charging into a controlled system:
properly designed, professionally installed, and continuously monitored.
Axel van LOMBEEK
CEO MEGA Charge

What you get with MEGA Charge

End-to-end charging infrastructure: designed for your fleet and operation, professionally installed and operationally managed for maximum uptime.

High uptime through monitoring, follow-up, and service

Scalable design that grows with your fleet

Control over capacity with a clear growth path within your connection

One point of contact from planning to operation

This is how we make charging infrastructure predictable

Start without a big leap. We clearly map out your charging site and needs and translate that into a feasible plan — with a low entry barrier and software management for maximum operational control.

01

Introduction

Scope, goals, and conditions clearly defined.

02

Preliminary design (low entry)

Site check + grid preparation + design + business case.

03

Installation (custom)

DC infrastructure + installation (BESS/AC/MS optional).

04

Project management

Grid study, coordination, and commissioning + a single point of contact.

05

Software & access (CPO)

Dashboard, charging cards, and smart control.

06

Operations & maintenance

Monitoring/service + (optional) extended warranty.

Result: less stress, more certainty

More trucks ready on time

Better utilization of your connection

Fewer incidents and downtime

Faster scaling without restart

CASES

Proven at charging locations where operations must not stop

See how customers increase uptime, reduce incidents, and enable expansion — without charging becoming the bottleneck.

How Group GTS gets its electric trucks ready to depart every morning

Overnight charging for e-trucks without impacting daily operations.

View the case

How Multiobus aligns charging infrastructure with passenger transport

Reliable charging for vehicles with fixed routes and schedules.

View the case

How Distrilog uses smart night charging for lower energy costs

Smart night charging for e-trucks at the lowest possible energy cost.

View the case
FAQ

Together through the transition

Good preparation is half the battle. Below you'll find answers to the most important questions we hear daily from transporters making the switch to emission-free driving.

How long does it take to get my charging infrastructure operational?

This depends on your site, grid capacity, and permitting process. On average, we're talking about ± 6 to 9 months from analysis to delivery. What's more important: we ensure this process remains predictable and manageable. From initial analysis to activation, we handle everything, so you can continue to focus on your operations.

What if my site doesn't have enough power capacity?

That's one of the most common challenges. We first analyze your current capacity and future consumption.

Based on that, we develop solutions such as:
- Smart charging (load balancing)
- Battery storage
- Phased rollout
- Grid reinforcement where necessary

This way, we ensure you can start today without blocking your growth.

Is electrification truly cost-effective for my fleet?

That's exactly the right question.

With our TCO tool, we calculate the total cost per kilometer, taking into account:
- Energy costs
- Investments
- Fleet utilization
- Operational impact

In many cases, electrification is already competitive today and will only become more so tomorrow.
We make the business case concrete and measurable, not theoretical.

What makes MEGA Charge different from other providers?

We don't supply charging stations. We build a complete energy ecosystem around your fleet.

This means:
- Strategy
- Design
- Installation
- Software
- Operational support

One partner. One vision. Maximum uptime.

How do I ensure my trucks are always charged?

It's not about charging stations, but about smart energy management.

We combine infrastructure with software that:
- Automatically schedules charging sessions
- Optimizes energy consumption
- Avoids peak consumption
- Prioritizes vehicles departing first

Result: minimal operational impact.

Do I have to invest everything at once?

No. We build a scalable solution that grows with your fleet. You start with what you need today and expand as your fleet grows. This way, you avoid over-investment and maintain flexibility.

Do you work with specific charging stations or brands?

No. We choose technology based on what works best for your site and operation. Not based on a single supplier.

This guarantees:
- Better performance
- More flexibility
- Future-proofness